Infrastructure Deployment





Project Start:
Project Finish:
Mon 1/3/00
Tue 7/18/00


Tasks


ID
Task Name
DurationStartFinishResource Names% Complete
1
Infrastructure Deployment Template
141.25 daysMon 1/3/00Tue 7/18/00 0%
2
Scope
4 daysMon 1/3/00Thu 1/6/00 0%
3
Determine project scope
1 dayMon 1/3/00Mon 1/3/00Project management0%
4
Secure project sponsorship
1 dayTue 1/4/00Tue 1/4/00Project management0%
5
Define preliminary resources
1 dayWed 1/5/00Wed 1/5/00Project management0%
6
Secure core resources
1 dayThu 1/6/00Thu 1/6/00Project management0%
7
Scope complete
0 daysThu 1/6/00Thu 1/6/00 0%
8
Analysis
30 daysFri 1/7/00Thu 2/17/00 0%
9
Review Current Infrastructure
5 daysFri 1/7/00Thu 1/13/00 0%
10
Review hardware environment
5 daysFri 1/7/00Thu 1/13/00Architecture analyst0%
11
Review software environment
5 daysFri 1/7/00Thu 1/13/00Architecture analyst0%
12
Review communications environment
5 daysFri 1/7/00Thu 1/13/00Architecture analyst0%
13
Review connectivity LAN/WAN
5 daysFri 1/7/00Thu 1/13/00Architecture analyst0%
14
Review support environment
5 daysFri 1/7/00Thu 1/13/00Architecture analyst0%
15
Review geographic factors
5 daysFri 1/7/00Thu 1/13/00Architecture analyst0%
16
Review current infrastructure complete
0 daysThu 1/13/00Thu 1/13/00 0%
17
Review business goals/direction/vision
10 daysFri 1/14/00Thu 1/27/00Project management0%
18
Identify Target Areas for Improvement
5 daysFri 1/28/00Thu 2/3/00 0%
19
Identify hardware improvements
5 daysFri 1/28/00Thu 2/3/00Architecture analyst0%
20
Identify software improvements
5 daysFri 1/28/00Thu 2/3/00Architecture analyst0%
21
Identify communications considerations
5 daysFri 1/28/00Thu 2/3/00Architecture analyst0%
22
Identify connectivity LAN/WAN improvements/issues
5 daysFri 1/28/00Thu 2/3/00Architecture analyst0%
23
Identify support environment improvements/additions
5 daysFri 1/28/00Thu 2/3/00Architecture analyst0%
24
Identify mitigation of geographic factors
5 daysFri 1/28/00Thu 2/3/00Architecture analyst0%
25
Identify target areas for improvement
0 daysThu 2/3/00Thu 2/3/00 0%
26
Define system requirements
5 daysFri 2/4/00Thu 2/10/00Architecture analyst0%
27
Define target performance metrics
5 daysFri 2/11/00Thu 2/17/00Architecture analyst0%
28
Review Current Market Solution Vendors
5 daysFri 2/4/00Thu 2/10/00 0%
29
Hardware vendors
5 daysFri 2/4/00Thu 2/10/00Procurement0%
30
Software vendors
5 daysFri 2/4/00Thu 2/10/00Procurement0%
31
Communications vendors
5 daysFri 2/4/00Thu 2/10/00Procurement0%
32
Design partners
5 daysFri 2/4/00Thu 2/10/00Procurement0%
33
Implementation partners
5 daysFri 2/4/00Thu 2/10/00Procurement0%
34
Review current market solution vendors complete
0 daysThu 2/10/00Thu 2/10/00 0%
35
Analysis complete
0 daysThu 2/17/00Thu 2/17/00 0%
36
Design
27 daysFri 2/18/00Mon 3/27/00 0%
37
Secure necessary architectural resources
3 daysFri 2/18/00Tue 2/22/00Project management0%
38
Draft Preliminary Infrastructure Design Documents
5 daysWed 2/23/00Tue 2/29/00 0%
39
Preliminary hardware design
5 daysWed 2/23/00Tue 2/29/00Architecture analyst0%
40
Preliminary software design
5 daysWed 2/23/00Tue 2/29/00Architecture analyst0%
41
Preliminary communications design
5 daysWed 2/23/00Tue 2/29/00Architecture analyst0%
42
Preliminary connectivity LAN/WAN design
5 daysWed 2/23/00Tue 2/29/00Architecture analyst0%
43
Preliminary support environment design
5 daysWed 2/23/00Tue 2/29/00Architecture analyst0%
44
Draft preliminary infrastructure design document complete
0 daysTue 2/29/00Tue 2/29/00 0%
45
Review preliminary design documents
2 daysWed 3/1/00Thu 3/2/00Project management,Management0%
46
Obtain feedback/input on design
2 daysFri 3/3/00Mon 3/6/00Project management,Management0%
47
Develop Detailed Infrastructure Design Documents
5 daysTue 3/7/00Mon 3/13/00 0%
48
Develop detailed hardware design
5 daysTue 3/7/00Mon 3/13/00Architecture analyst0%
49
Develop detailed software design
5 daysTue 3/7/00Mon 3/13/00Architecture analyst0%
50
Develop detailed communications design
5 daysTue 3/7/00Mon 3/13/00Architecture analyst0%
51
Develop detailed connectivity LAN/WAN design
5 daysTue 3/7/00Mon 3/13/00Architecture analyst0%
52
Develop detailed support environment design
5 daysTue 3/7/00Mon 3/13/00Architecture analyst0%
53
Develop detailed infrastructure design documents complete
0 daysMon 3/13/00Mon 3/13/00 0%
54
Align long/short term infrastructure design with business goals
10 daysTue 3/14/00Mon 3/27/00Architecture analyst,Project management0%
55
Design complete
0 daysMon 3/27/00Mon 3/27/00 0%
56
Budget
16 daysTue 3/28/00Tue 4/18/00 0%
57
Develop budget based on detailed infrastructure documents
5 daysTue 3/28/00Mon 4/3/00Project management0%
58
Align budget request with business goals
5 daysThu 3/30/00Thu 4/6/00Project management0%
59
Align budget request with infrastructure requirements timeline
5 daysTue 4/4/00Mon 4/10/00Project management0%
60
Present long/short term budget request
3 daysTue 4/11/00Thu 4/13/00Project management0%
61
Secure multi-phase/year funding for key initiatives
3 daysFri 4/14/00Tue 4/18/00Project management0%
62
Budget complete
0 daysTue 4/18/00Tue 4/18/00 0%
63
Finalization/Validation
17.5 daysWed 4/19/00Fri 5/12/00 0%
64
Secure resources based upon approved initiatives
5 daysWed 4/19/00Tue 4/25/00Project management0%
65
Finalize detailed design based upon budgetary considerations
2 daysWed 4/26/00Thu 4/27/00Project management0%
66
Develop detailed implementation strategy
5 daysFri 4/28/00Thu 5/4/00Deployment resources0%
67
Validate implementation strategy in test environment
3 daysFri 5/5/00Tue 5/9/00Deployment resources0%
68
Review implementation strategy noting other initiatives
2 daysWed 5/10/00Thu 5/11/00Deployment resources0%
69
Secure approval to proceed
4 hrsFri 5/12/00Fri 5/12/00Project management0%
70
Finalization/validation complete
0 daysFri 5/12/00Fri 5/12/00 0%
71
Deployment
43.75 daysFri 5/12/00Thu 7/13/00 0%
72
Logistics
8 daysFri 5/12/00Wed 5/24/00 0%
73
Secure deployment resources
5 daysFri 5/12/00Fri 5/19/00Project management,Deployment resources0%
74
Train deployment resources in deployment methodology
3 daysFri 5/19/00Wed 5/24/00Project management,Deployment resources0%
75
Logistics complete
0 daysWed 5/24/00Wed 5/24/00 0%
76
Pilot
10.5 daysWed 5/24/00Wed 6/7/00 0%
77
Select infrastructure component to deploy
1 dayWed 5/24/00Thu 5/25/00Project management,Deployment resources0%
78
Review deployment team tasks and timeline
2 daysThu 5/25/00Mon 5/29/00Project management,Deployment resources0%
79
Communicate impact to community
2 hrsMon 5/29/00Mon 5/29/00Project management,Deployment resources0%
80
Deploy infrastructure component
3 daysMon 5/29/00Thu 6/1/00Project management,Deployment resources0%
81
Test infrastructure component
1 dayThu 6/1/00Fri 6/2/00Project management,Deployment resources0%
82
Release to production/operations environment
2 hrsFri 6/2/00Fri 6/2/00Project management,Deployment resources0%
83
Obtain feedback
2 daysMon 6/5/00Tue 6/6/00Project management,Deployment resources0%
84
Evaluate pilot feedback
1 dayWed 6/7/00Wed 6/7/00Project management,Deployment resources0%
85
Pilot complete
0 daysWed 6/7/00Wed 6/7/00 0%
86
Determine readiness to proceed
1 dayThu 6/8/00Thu 6/8/00Project management,Management0%
87
Final Deployment
24.25 daysFri 6/9/00Thu 7/13/00 0%
88
Review deployment team tasks and timeline
5 daysFri 6/9/00Thu 6/15/00Deployment resources0%
89
Communicate impact to community
2 hrsFri 6/16/00Fri 6/16/00Deployment resources0%
90
Deploy infrastructure components
10 daysFri 6/16/00Fri 6/30/00Deployment resources0%
91
Test infrastructure component
5 daysFri 6/30/00Fri 7/7/00Deployment resources0%
92
Release to production/operations environment
1 dayFri 7/7/00Mon 7/10/00Deployment resources0%
93
Obtain feedback
3 daysMon 7/10/00Thu 7/13/00Deployment resources0%
94
Final deployment complete
0 daysThu 7/13/00Thu 7/13/00 0%
95
Post Implementation Review
3 daysThu 7/13/00Tue 7/18/00 0%
96
Document lessons learned
1 dayThu 7/13/00Fri 7/14/00Architecture analyst,Project management,Deployment resources0%
97
Distribute to team members
1 dayFri 7/14/00Mon 7/17/00Architecture analyst,Project management,Deployment resources0%
98
Create software maintenance team
1 dayMon 7/17/00Tue 7/18/00Architecture analyst,Project management,Deployment resources0%
99
Post implementation review complete
0 daysTue 7/18/00Tue 7/18/00 0%
100
Infrastructure deployment template complete
0 daysTue 7/18/00Tue 7/18/00 0%

Resources


IDNameGroupMax UnitsPeak Units
1Architecture analyst 100%600%
2Project management 100%200%
3Deployment resources 100%100%
4Procurement 100%500%
5Management 100%100%

Assignments


Task IDTask NameResource NameWorkStartFinish% Work Complete
3Determine project scopeProject management8 hrsMon 1/3/00Mon 1/3/000%
4Secure project sponsorshipProject management8 hrsTue 1/4/00Tue 1/4/000%
5Define preliminary resourcesProject management8 hrsWed 1/5/00Wed 1/5/000%
6Secure core resourcesProject management8 hrsThu 1/6/00Thu 1/6/000%
10Review hardware environmentArchitecture analyst40 hrsFri 1/7/00Thu 1/13/000%
11Review software environmentArchitecture analyst40 hrsFri 1/7/00Thu 1/13/000%
12Review communications environmentArchitecture analyst40 hrsFri 1/7/00Thu 1/13/000%
13Review connectivity LAN/WANArchitecture analyst40 hrsFri 1/7/00Thu 1/13/000%
14Review support environmentArchitecture analyst40 hrsFri 1/7/00Thu 1/13/000%
15Review geographic factorsArchitecture analyst40 hrsFri 1/7/00Thu 1/13/000%
17Review business goals/direction/visionProject management80 hrsFri 1/14/00Thu 1/27/000%
19Identify hardware improvementsArchitecture analyst40 hrsFri 1/28/00Thu 2/3/000%
20Identify software improvementsArchitecture analyst40 hrsFri 1/28/00Thu 2/3/000%
21Identify communications considerationsArchitecture analyst40 hrsFri 1/28/00Thu 2/3/000%
22Identify connectivity LAN/WAN improvements/issuesArchitecture analyst40 hrsFri 1/28/00Thu 2/3/000%
23Identify support environment improvements/additionsArchitecture analyst40 hrsFri 1/28/00Thu 2/3/000%
24Identify mitigation of geographic factorsArchitecture analyst40 hrsFri 1/28/00Thu 2/3/000%
26Define system requirementsArchitecture analyst40 hrsFri 2/4/00Thu 2/10/000%
27Define target performance metricsArchitecture analyst40 hrsFri 2/11/00Thu 2/17/000%
29Hardware vendorsProcurement40 hrsFri 2/4/00Thu 2/10/000%
30Software vendorsProcurement40 hrsFri 2/4/00Thu 2/10/000%
31Communications vendorsProcurement40 hrsFri 2/4/00Thu 2/10/000%
32Design partnersProcurement40 hrsFri 2/4/00Thu 2/10/000%
33Implementation partnersProcurement40 hrsFri 2/4/00Thu 2/10/000%
37Secure necessary architectural resourcesProject management24 hrsFri 2/18/00Tue 2/22/000%
39Preliminary hardware designArchitecture analyst40 hrsWed 2/23/00Tue 2/29/000%
40Preliminary software designArchitecture analyst40 hrsWed 2/23/00Tue 2/29/000%
41Preliminary communications designArchitecture analyst40 hrsWed 2/23/00Tue 2/29/000%
42Preliminary connectivity LAN/WAN designArchitecture analyst40 hrsWed 2/23/00Tue 2/29/000%
43Preliminary support environment designArchitecture analyst40 hrsWed 2/23/00Tue 2/29/000%
45Review preliminary design documentsProject management16 hrsWed 3/1/00Thu 3/2/000%
45Review preliminary design documentsManagement16 hrsWed 3/1/00Thu 3/2/000%
46Obtain feedback/input on designProject management16 hrsFri 3/3/00Mon 3/6/000%
46Obtain feedback/input on designManagement16 hrsFri 3/3/00Mon 3/6/000%
48Develop detailed hardware designArchitecture analyst40 hrsTue 3/7/00Mon 3/13/000%
49Develop detailed software designArchitecture analyst40 hrsTue 3/7/00Mon 3/13/000%
50Develop detailed communications designArchitecture analyst40 hrsTue 3/7/00Mon 3/13/000%
51Develop detailed connectivity LAN/WAN designArchitecture analyst40 hrsTue 3/7/00Mon 3/13/000%
52Develop detailed support environment designArchitecture analyst40 hrsTue 3/7/00Mon 3/13/000%
54Align long/short term infrastructure design with business goalsArchitecture analyst80 hrsTue 3/14/00Mon 3/27/000%
54Align long/short term infrastructure design with business goalsProject management80 hrsTue 3/14/00Mon 3/27/000%
57Develop budget based on detailed infrastructure documentsProject management40 hrsTue 3/28/00Mon 4/3/000%
58Align budget request with business goalsProject management40 hrsThu 3/30/00Thu 4/6/000%
59Align budget request with infrastructure requirements timelineProject management40 hrsTue 4/4/00Mon 4/10/000%
60Present long/short term budget requestProject management24 hrsTue 4/11/00Thu 4/13/000%
61Secure multi-phase/year funding for key initiativesProject management24 hrsFri 4/14/00Tue 4/18/000%
64Secure resources based upon approved initiativesProject management40 hrsWed 4/19/00Tue 4/25/000%
65Finalize detailed design based upon budgetary considerationsProject management16 hrsWed 4/26/00Thu 4/27/000%
66Develop detailed implementation strategyDeployment resources40 hrsFri 4/28/00Thu 5/4/000%
67Validate implementation strategy in test environmentDeployment resources24 hrsFri 5/5/00Tue 5/9/000%
68Review implementation strategy noting other initiativesDeployment resources16 hrsWed 5/10/00Thu 5/11/000%
69Secure approval to proceedProject management4 hrsFri 5/12/00Fri 5/12/000%
73Secure deployment resourcesProject management40 hrsFri 5/12/00Fri 5/19/000%
73Secure deployment resourcesDeployment resources40 hrsFri 5/12/00Fri 5/19/000%
74Train deployment resources in deployment methodologyProject management24 hrsFri 5/19/00Wed 5/24/000%
74Train deployment resources in deployment methodologyDeployment resources24 hrsFri 5/19/00Wed 5/24/000%
77Select infrastructure component to deployProject management8 hrsWed 5/24/00Thu 5/25/000%
77Select infrastructure component to deployDeployment resources8 hrsWed 5/24/00Thu 5/25/000%
78Review deployment team tasks and timelineProject management16 hrsThu 5/25/00Mon 5/29/000%
78Review deployment team tasks and timelineDeployment resources16 hrsThu 5/25/00Mon 5/29/000%
79Communicate impact to communityProject management2 hrsMon 5/29/00Mon 5/29/000%
79Communicate impact to communityDeployment resources2 hrsMon 5/29/00Mon 5/29/000%
80Deploy infrastructure componentProject management24 hrsMon 5/29/00Thu 6/1/000%
80Deploy infrastructure componentDeployment resources24 hrsMon 5/29/00Thu 6/1/000%
81Test infrastructure componentProject management8 hrsThu 6/1/00Fri 6/2/000%
81Test infrastructure componentDeployment resources8 hrsThu 6/1/00Fri 6/2/000%
82Release to production/operations environmentProject management2 hrsFri 6/2/00Fri 6/2/000%
82Release to production/operations environmentDeployment resources2 hrsFri 6/2/00Fri 6/2/000%
83Obtain feedbackProject management16 hrsMon 6/5/00Tue 6/6/000%
83Obtain feedbackDeployment resources16 hrsMon 6/5/00Tue 6/6/000%
84Evaluate pilot feedbackProject management8 hrsWed 6/7/00Wed 6/7/000%
84Evaluate pilot feedbackDeployment resources8 hrsWed 6/7/00Wed 6/7/000%
86Determine readiness to proceedProject management8 hrsThu 6/8/00Thu 6/8/000%
86Determine readiness to proceedManagement8 hrsThu 6/8/00Thu 6/8/000%
88Review deployment team tasks and timelineDeployment resources40 hrsFri 6/9/00Thu 6/15/000%
89Communicate impact to communityDeployment resources2 hrsFri 6/16/00Fri 6/16/000%
90Deploy infrastructure componentsDeployment resources80 hrsFri 6/16/00Fri 6/30/000%
91Test infrastructure componentDeployment resources40 hrsFri 6/30/00Fri 7/7/000%
92Release to production/operations environmentDeployment resources8 hrsFri 7/7/00Mon 7/10/000%
93Obtain feedbackDeployment resources24 hrsMon 7/10/00Thu 7/13/000%
96Document lessons learnedArchitecture analyst8 hrsThu 7/13/00Fri 7/14/000%
96Document lessons learnedProject management8 hrsThu 7/13/00Fri 7/14/000%
96Document lessons learnedDeployment resources8 hrsThu 7/13/00Fri 7/14/000%
97Distribute to team membersArchitecture analyst8 hrsFri 7/14/00Mon 7/17/000%
97Distribute to team membersProject management8 hrsFri 7/14/00Mon 7/17/000%
97Distribute to team membersDeployment resources8 hrsFri 7/14/00Mon 7/17/000%
98Create software maintenance teamArchitecture analyst8 hrsMon 7/17/00Tue 7/18/000%
98Create software maintenance teamProject management8 hrsMon 7/17/00Tue 7/18/000%
98Create software maintenance teamDeployment resources8 hrsMon 7/17/00Tue 7/18/000%


Microsoft Home Page
Microsoft Project Home Page